Combined TransportNetworkGreen TransportCO₂ CalculatorInsightsContact LinkedIn → Get a Quote →
Industry Guide

Cement & Building Materials Intermodal Transport in Europe
Bagged Cement & Palletised Goods

We carry bagged cement and palletised building materials in our cranable curtain-sided trailers between Germany, Italy, the Baltic States and Scandinavia. Heavy pallets travel the long distance by rail or ferry and reach merchants, depots and sites by truck — loaded once at the plant.

28t
cargo per trailer
cranable curtain-sider
44t
gross weight
instead of 40t by road
2.65m
side opening
forklift from both sides

Why Intermodal for Cement and Building Materials

How It Works with Cranable Trailers

Every shipment runs in our own cranable curtain-sided trailers — 13.6 m long, with a 2.65 m side opening for forklift loading from both sides and the securing equipment on board: straps, edge protectors, anti-slip mats, distancing boards and pillows.

  1. Loading at the plant. Pallets of bagged cement, blocks, tiles or boards are loaded from the side by forklift and spread evenly over the trailer floor.
  2. Truck to the terminal. A truck takes the loaded trailer to the intermodal terminal.
  3. Crane lift. A gantry crane or reach stacker lifts the whole trailer by its four corner points onto a rail wagon or a RoRo ferry deck. The cargo itself is not touched or re-secured.
  4. Main leg by rail or sea. The long haul runs by rail or RoRo ferry, connected through our hub in Lübeck.
  5. Destination terminal. The trailer is lifted off and handed over to a local truck.
  6. Delivery. A local truck delivers to the builders’ merchant, depot or site. Pallets are unloaded from the side by forklift, so the delivery point needs one.

What to Know When Shipping Cement and Building Materials

Corridors We Run

Building materials move on our lanes between Germany, Italy, the Baltic States and Scandinavia, for example:

All our lanes and how they connect: combined transport in Europe.

CO₂

Per tonne of cargo, our intermodal lanes emit up to 66% less CO₂e than the same shipment by road — well-to-wheel, calculated with EcoTransIT World (ISO 14083 / GLEC methodology), with first and last mile by truck included. The saving differs by lane; ferry legs reduce it. Assumptions and sources: methodology. For heavy, low-value materials the transport leg is a visible part of the footprint, and per-tonne figures make it comparable across suppliers.

FAQ: Cement & Building Materials

Do you transport bulk cement?

No. Our curtain-sided trailers carry packaged goods — bagged cement and palletised building materials. Bulk cement in powder form needs silo equipment.

How much cement fits in one trailer?

Up to 28 t of cargo per cranable trailer. In combined transport the gross weight may be 44 t instead of 40 t by road. With cement the limit is weight, so the pallets have to be spread over the floor.

Can you deliver directly to a construction site?

The last mile is by truck to the address you give us, including sites, as long as the truck can reach the unloading point and a forklift is available there to unload from the side.

How is the cement protected from rain?

The pallets stay in the closed curtain-sided trailer from loading to delivery and are not unloaded at the terminals. Keep them wrapped or hooded and load onto a dry floor.

Moving Cement or Building Materials?

Send us your plants, delivery points, pallet weights and volumes — as a tender file or as a single request. We come back with a quote and a CO₂ estimate per lane.

Send your tender → Get a quote